The passenger walkway ramp from the holding lanes at the Bainbridge Island Ferry Terminal will be closed later this week while pothole repairs are performed.
The work is planned from 8 a.m. to 4 p.m. Thursday, Jan. 10.
The sidewalk and stairwell leading to the lower restrooms will also be closed.
All walk-on traffic will embark and disembark the ferries via the overhead loading concourse during the closure.